




Sea Lanes, Eden Dock
Three 5.5m cedar-clad geodesic timber domes at the heart of the waterside terrace of the new National Open Water Swimming Centre — delivered with Canary Wharf Group and completed ahead of the June 2026 public opening.
Sheltered, all-weather seating trading beside the pool, all year round.
























